Well yes, I know that's available, but that is scheduling on every timeline. What I want is the same in the studio, where I can make a collection of multiple timelines (a.k.a. sequences) and schedule them.
So for example you have:
Sequence1: Timeline1, Timeline2
Sequence2: Timeline2, Timeline3, Timeline4
Now I want to schedule Sequence1 and Sequence2, not every seperate timeline.
Is this possible within the StudioLite or can I access those sequences or create the table by myself?